From idea to reality: planning a construction project from a legal perspective

Published on 23 November 2021 Langlois Lawyers Article

We have all, at one time or another, witnessed the poor execution of a great idea.

The first film adaptation of Frank Herbert’s masterpiece Dune, by David Lynch in 1984, is a prime example of this phenomenon—but the same thing can happen with construction projects.

How can we make it work?

Here are some elements that, while not exhaustive, can help limit the risks of failure.

The importance of the pre-construction phase

If there is any consensus within the construction industry community, it concerns the importance of devoting sufficient qualified resources, both human and material, to the pre-construction phase.

This stage, which ensures better quality documents (i.e., statement of conceptual requirements, plans and specifications, preliminary studies, budgets, provisional schedules, etc.), is too often neglected for budgetary and scheduling reasons.

However, the amount of attention devoted to this phase will be inversely proportional to the amount of attention that will have to be directed to making changes during the call for tenders or, even worse, the construction phase.

In principle, changes during execution:

  • will cost more, because
    • they will not be subject to the competition process;
    • they will require changes to the planning and coordination already underway with the contractor, subcontractors and suppliers;
    • they will be subject to the market conditions prevailing at the time, as opposed to those prevailing at the time of the call for tenders, including changes in the market for labour, equipment and materials;
  • will require more time (including back and forth between the owner, professionals, contractor, subcontractors and suppliers), with each critical day impacting overhead costs and extending the footprint of the site stakeholders;
  • will, incidentally, result in more disputes between the parties, thereby causing relational impacts, further delays and additional costs.

In a market where the best players have no trouble getting contracts, it is becoming increasingly difficult to attract them under these circumstances.

The importance of delivery and payment methods

Identifying the delivery method remains essential, but it is rarely accorded the importance it deserves.

General contracting, management for services, management for services and construction, design-build, integrated delivery, and hybrid methods (partial or progressive design-build, pre-procurement and construction by lots with or without assignment, etc.) each have their advantages and disadvantages with a butterfly effect in terms of risk.

The same is true for payment methods. Risks related to estimation errors; changes in the market and the cost of labour, equipment and materials; subcontractor insolvency; and other economic risks will be allocated differently depending on whether lump sum, unit, cost plus or target price is chosen, with or without a guaranteed maximum price and/or sharing of savings and overruns.

The various risks can be addressed through insurance, bonding, subcontracting, risk and contingency reserves, etc., but they will have to be treated consistently according to the principle that more risk = more reward.

To identify the method best suited to their needs, clients should determine, among other things:

  • the applicable regulatory framework, especially for public sector clients;
  • the role they are willing to assume (project management, holding of licenses, etc.);
  • the degree of control they wish to have over the design, beyond stating their conceptual requirements, or even the desire to obtain several different preliminary concepts that meet, in principle, those requirements;
  • the degree of competition they wish to employ (overall design and work, all work, split by lots, etc.);
  • the space and time required for technical equipment, including whether they wish to use various alternatives such as pre-procurement with or without subsequent disposal;
  • the cost-benefit analysis of coordinating certain stakeholders at the pre-construction phase;
  • whether or not work can begin before the design has been finalized and the Class A budget and schedule estimates have been obtained (i.e., whether fast-tracking is an option);

When in doubt, we generally recommend opting for a method that favours the coordination of stakeholders at the pre-construction phase in order to benefit from their respective expertise and to improve the quality of the conceptual documents before the delays and costs associated with each modification are multiplied by the reality of a construction site in full operation.

We hope that these few tips provide clarity and will allow you to be more successful in executing your projects.

Poursuivre la lecture sur le sujet

Article 9 February 2024

Energy efficiency: Financial support to put your ideas into action

Leading a company involves balancing several priorities at the same time. Energy efficiency? It’s an important issue—one of many! What if we gave you what you need to make energy efficiency a driving force behind your company’s performance and profitability? The good news is, Hydro-Québec offers financial assistance and guidance to help you balance performance and energy efficiency.

Read more
Article 31 October 2023

My Consumption Profile: data that lets you strategically manage your electricity use

Companies have a critical role to play in the energy transition. Knowing that energy efficiency factors big into profitability, your organization will benefit from strategically managing its electricity use. The key? Your data!

Read more
Article 27 October 2023

Electrifying school bus fleets : Grants available to support your project

In this series of articles, we demystify the key steps of converting your school bus fleet to electric power thanks to the Transporteur+ guide. This guide aims to provide easy and direct access to resources to clarify the steps, issues, conditions and facilitating measures for a successful transition to electrification.

Read more
Article 10 October 2023

Electrifying school bus fleets | Key step : Comissioning

In this series of articles, we demystify the key steps of converting your school bus fleet to electric power thanks to the Transporteur+ guide. This guide aims to provide easy and direct access to resources to clarify the steps, issues, conditions and facilitating measures for a successful transition to electrification.

Read more
Article 26 September 2023

FINANCING | $50 million from Finalta Capital in non-dilutive financing dedicated to the Electric and Smart Transportation sector

Fast growing, innovative companies from the electric and smart transportation (EST) sector in Québec take advantage of the $50 million in funding dedicated to the EST ecosystem by Finalta Capital, one of Canada’s largest funds specialized in non-dilutive tax credit and government grant financing, announced in March 2023 as part of the Impulsion conference, the International EST Summit organized by Propulsion Québec.

Read more
Article 26 September 2023

Demand response: Save money by using hydro at the right times

If you could lower your company's hydro bill while contributing to the collective effort to support Quebec’s energy transition, would you? Yes, most likely! How? By curbing power demand for buildings and equipment during peak demand events. 

Read more
Article 15 September 2023

Electrifying school bus fleets : The importance of adapting buildings and infrastructure

In this series of articles, we demystify the key steps of converting your school bus fleet to electric power thanks to the Transporteur+ guide. This guide aims to provide easy and direct access to resources to clarify the steps, issues, conditions and facilitating measures for a successful transition to electrification.

Read more
Article 14 August 2023

Electrifying school bus fleets : Implementing the pilot project and phase-in

In this series of articles, we demystify the key steps of converting your school bus fleet to electric power thanks to the Transporteur+ guide. This guide aims to provide easy and direct access to resources to clarify the steps, issues, conditions and facilitating measures for a successful transition to electrification

Read more
Article 26 July 2023

Electrifying school bus fleets: The importance of choosing your suppliers

In this series of articles, we demystify the key steps of converting your school bus fleet to electric power thanks to the Transporteur+ guide. This guide aims to provide easy and direct access to resources to clarify the steps, issues, conditions and facilitating measures for a successful transition to electrification.

Read more
Article 28 June 2023

The key to a successful school bus fleet electrification project

In this series of articles, we demystify the key steps of converting your school bus fleet to electric power thanks to the Transporteur+ guide. This guide aims to provide easy and direct access to resources to clarify the steps, issues, conditions and facilitating measures for a successful transition to electrification.

Read more
Article 26 April 2023

FLO®: sparking change, one charge at a time

FLO became a leader in electric vehicle (EV) charging in North America by integrating the process from start to finish: manufacturing charging stations, developing software and managing its network. To stay ahead of the curve in a fast-moving, innovation-driven market, the company turned to the Fonds de solidarité FTQ to support its growth.

Read more
Article 9 March 2023

A TRIBUTE TO THE WOMEN IN OUR ECOSYSTEM – A portrait of the situation in the public domain

For a long time, the transportation sector consisted mostly of men. In the past ten years or so, more and more women can be found around discussion tables, in management roles and on executive boards of different leading corporations and organizations in our ecosystem.

Read more